Competence through experience

The company IKW Industriekraftwerke E&C GmbH offers know-how and knowledge in energy generation through decades of experience

The "Industriekraftwerke.at" group is an association of experienced engineers and business people with many decades of experience in power plant construction and energy technology.

Many of our colleagues learned their trade at the former SGP/Waagner Biro/Austrian Energy.

We offer our customers "everything from a single source" and focus on the task as owner's engineer for new systems, conversions, extensions or optimisations.

We specialize in concepts for reducing energy costs. This is done primarily with the implementation of highly efficient generation units, the utilization of energy potential (waste heat, energy efficiency) and the exit from expensive primary energy sources.

Since we are not a corporation, manufacturer
or belong to technological interest groups,
we are able to provide the BEST for the customer
to develop solution.
{{trans:6b5b4fc4528bb4ee776867a0fad55d40_1}} image

  • Energy for industry, intelligent and innovative use of primary energy
  • Natural gas, biomass, industrial waste, PV, district heating, industrial sludge
  • Municipal sewage sludge mono-incineration
  • Gas and steam turbines, as well as fluidized bed, grate and waste heat boilers
  • Inventories and analyses, energy concepts, feasibility studies
  • Financing concepts, subsidies
We offer you as YOUR owner's engineer :
  • Comprehensive project management from a single source.
  • Benefit from a proactively leading and decision-making project management as well as a well-rehearsed team with short coordination paths.
  • Continuous project support from feasibility analysis to trial operation
  • Experienced project managers with interdisciplinary knowledge, well-rehearsed and cross-trade project teams
  • Proven structures and division of tasks
  • On-schedule and cost-effective processing

We specifically target those industrial companies that need support and resources to implement the following project ideas: 

  • Drastic reduction of energy costs
  • Reduction of dependence on a single primary energy source
  • Increases in output, throughput, travel time extensions
  • Increases in efficiency
  • Increase in the fuel utilization rate
  • Reduction in consumption of operating resources
  • Reduction in maintenance costs
  • Reduction in emissions

Energy efficiency, measures for waste heat utilization

  • Utilization of low-temperature waste heat from exhaust air hoods of paper machines and conversion into steam for the plant network
  • Utilization of low-temperature waste heat from cooling circuits and conversion into steam for the mill network
  • Recovery of cellulose from reject waste
  • Realization of a “water-free power plant” for places without infrastructure and countries with water scarcity

General planning in energy production

  • With concept engineering with economic feasibility studies
  • Approval planning and basic engineering
  • Tenders, support during the purchasing process
  • Project management until the plant is handed over

EPC-M, support in implementation

  • We act as general planners
  • Prepare the invitations to tender, by lot or according to focal points
  • Support the purchasing process
  • Act as owner's engineers during implementation and take care of deadlines, quality, finances and interfaces
  • Carry out production control Create and monitor the assembly and commissioning of the entire system

Project engineers and consultants in numerous topics of energy, energy efficiency and energy generation

  • Fuels and alternative fuels such as RDF and sludge, biomass, new fuels such as liquid biogenic fuels, or ethanol and methanol
  • Boiler plants, steam turbines, gas turbines, gas engines
  • Power to heat
  • Waste to energy
  • Energy storage in large-scale battery systems, steam storage or large-scale district heating storage systems
  • Operational management
  • CE marking, plant safety, risk assessment
  • District heat extraction, innovative heat pump solutions, steam heat pumps
  • Participation in the balancing energy market
  • Special topics such as hydrogen, CO2 certificates, electricity exchange, carbon capture, control and balancing energy, financing of complete plants, contracting
  • CHP plants in general and combined heat and power plants with/without district heating extraction with maximum electrical efficiency (>60%)
  • Profitability analysis incl. CAPEX and OPEX estimation
  • Production monitoring, installation monitoring, commissioning monitoring

energy efficiency paper machine

Energy efficiency – using exhaust air condensation from the hood exhaust of a paper machine

energy efficiency cooling water circuit

Energy efficiency – through waste heat utilization from low-temperature cooling circuit

recovery of valuable materials

Energie- & Wertstoff-Effizienz – mittels Wiedergewinnung von Zellulose aus Rejektabfällen

IKW Industriekraftwerke E&C GmbH

General company presentation IKW

Pre-project phase

Pre-project phase

The services provided as owner's engineers in the pre-project phase include:

Learn More
Implementation phase

Implementation phase

The services provided as owner's engineers in the implementation phase include:

Learn More

Unser Team und Partner

Competence through experience

Process engineering, residue boiler, energy efficiency

FEED engineering, project management, operational management

Project development, commercial functions, contract management

Projektleiterin, Risiko- & Chancenmanagement, CE-Kennzeichnung & Technische Dokumentation, Prozessmanagement

Design of the entire system, steam boiler, gas turbines

Balance of Plant, steam turbines, project development

Process engineering, EI&C, commissioning

Project management, quality management, layout planning

Project development, project management, service

Medium and high voltage technology, electrical protection technology

Project management, assembly

Project planning and project management

Technical Chemistry, Technology Development

Projektmanagement, Experte für Biomassekessel und Fernwärme

The references given are personal references of the respective colleagues in their former and current companies/activities and thus represent a testimony of personal experience and skills.

We explicitly point out that these are not company references of the company IKW Industriekraftwerke E&C GmbH.

Gas turbine CHP Sabac/Serbia 3 x 4.6 MWel, 13.5 MWth, natural gas

• Owners Engineer • Process Engineering, FEED & Owners Engineering • Overall Plant Planning • Tendering

PP Cayirhan/Turkey Units 3 & 4 320 MWel Lignite and heavy fuel oil

• Process engineering • Technical project management • Commissioning • Trial operation

Gas turbine CHP Laakirchen/Austria 60 MWel, 90 MWth

• Owners Engineer • Process engineering, FEED & Owners Engineering • Overall plant planning • Extension of submission planning • Operational management

Gas turbines KWK Graz/Austria 25 MWel, 90 MWth

• Overall plant planning, FEED & Owners Engineering • Extension of submission planning • Process engineering • Operational management

Combined Cycle Power Plant Anta, India 3×100 MWel

• Project development • Process engineering • Drafting of contracts

Combined Cycle Power Plant Kawas/India 4×100 MWel

• Project development • Process engineering • Drafting of contracts

Combined Cycle Power Plant Auraya/India 4×100 MWel

• Project development • Process engineering • Drafting of contracts

Combined Cycle Power Plant Csepel/Hungary 2×150 MWel

• Project development • Process engineering • Drafting of contracts

Waste heat boiler Norske Skog, Bruck ad Mur/Austria 1x 2-pressure boiler additionally fired behind 40 MW gas turbine

• Project development • Contract drafting • Technical project management • Delivery • Assembly • Commissioning • Trial operation

Combined cycle power plant Jebel Ali G/Dubai 4×150 MWel plus 4x 200 t/h heavy oil boiler

• Project development • Process engineering • Drafting of contracts

Balancing energy pool (A1 Energy Pool – world direct)

• Market analysis and technical creation and design of a pool for control energy providers • Market entry • Market development

District heating plant Vienna South/Austria 320 MWth, natural gas

• Process engineering • Commissioning • Trial operation

Industrial power station at the paper mill/Austria (ongoing order)

• FEED & Owners Engineer • Overall Plant Planning • Permits • Tenders

Biomass power plant Bischofferode/Germany 20 MWel

• Project development • Basic engineering • Drafting of contracts

Residue incineration Leipa-Schwedt/Germany 1x 120 MWth circulating fluidized bed

• Project development • Contract drafting

Industrial power plant Faisalabad/Pakistan 20 MWel, coal-fired fluidized bed

• Project development • Process engineering • Drafting of contracts

Various CHPs based on biomass gasification South Tyrol/Italy 200 kWel + 400 kWth

• Project development • Project handling at a higher level • Process engineering • Drafting of contracts

Sewage sludge mono-incineration plant Styria 30,000 to/a KS

• Accompaniment of commissioning • Optimization of the plant including various conversions • Operational management of the plant

Uglevik power plant, flue gas cleaning, Republika Srpska,/Bosnia 300 MWel

• Process engineering • Steel construction

Steelworks Arcelor Mittal Zenica/BiH thermal recyclable material recycling, top and coke oven gas, 100 ton/h steam

• Process engineering • Overall plant planning

District heating plant Livno, BiH Boiler 10 MWth

• Project development and feasibility study • Overall plant planning • Process engineering

EfW Project Ogulin/Croatia

• Overall plant planning • Process engineering fluidized bed boiler plant

Paper mill Szolnok/Hungary

• Study on overall plant planning and process engineering

Paper mill Ruzomberok/Slovakia

• Process engineering • Overall plant planning

PS Plomin II 320 MWel hard coal

• Consortium management • Assembly • Commissioning • Trial operation

HPP Khartoum North Power Station 2x60MWel heavy oil

• Technical project management • Delivery • Assembly • Commissioning • Trial operation

Studen – Agrana Sugar Refinery doo Brcko/BiH

• Technical project management • Delivery • Assembly • Commissioning • Trial operation

KW Dhekelia Power Station 2x60MWel heavy oil

• Technical project management • Delivery • Assembly • Commissioning • Trial operation

Cottam Power Station/GB 2x flue gas desulfurization system

• Project management • Delivery • Installation

Steam turbine Laem Chabang/Thailand 35 MWel

• Technical project management • Delivery • Assembly • Commissioning • Trial operation

Steam turbine Yungkang 25 MWel

• Assembly • Commissioning with trial operation • Operational management

CHP project: Automobilfabrik Austria gas engine project 6 MWel

• Project development • Process engineering • Contracting

CHP project: Food industry Vienna/Austria Gas engine project 2 MWel

• Technical support for operational changes and • extensions to gas boilers

CHP project: Food industry Sremska Mitrovica/Serbia gas engine project 6 MWel

• Project development • Overall plant planning • Process engineering • Contracting

CHP project: district heating Sremska Mitrovica/Serbia gas engine project 2 x 10 MWel

• Project development • Overall plant planning • Process engineering • Tendering

CHP project: Food industry Sremska Mitrovica/Serbia gas engine project 4 MWel

• Project development • Overall plant planning • Process engineering • Tendering

Projects in the field of renewable energy systems: Wind farm with 46 MW & PV systems with >20MWp

• Process engineering • Approval • Financing to implementation and organization of operations • Due diligence for financing banks

Projects in the field of renewable energy plants: 9 biogas plants & 1 small hydroelectric power plant

• Process engineering • Planning • Approval • Extension to waste materials • Implementation • Financing • Due diligence for financing banks • Organization of operations

Projects in the field of renewable energy systems: Biomass power plant 2 MWel

Projects in the field of renewable energy systems: various biomass power plants 0.5 to 8 MWel in Ö and D process engineering • process engineering • approval • status assessments • due diligence • renovation concept • fuel pre-drying • optimization of waste heat use

Steam turbine Lenzing AG 28 MWel

• Project development • Construction of steam turbine • Production of steam turbine at an external partner company • Technical project management • Delivery • Assembly • Commissioning • Trial operation

energy audits

according to EN 16247 for industrial companies and large commercial companies

Appraisal according to ÖSG

for green power plants, energy tax refunds, etc.

Emission Certificates Act

• Carrying out checks in accordance with EZG

Projects in the field of renewable energy systems: steam turbine biomass power plant 2 MW Ö

• Analysis of operating behavior and creation of operating specifications

PP Maritsa Bulgaria / flue gas desulfurization plant for KW output 670 MW

• Medium voltage network calculation • Medium voltage protection calculation, programming and testing

KW Turceni Romania / flue gas desulfurization plant for KW output 1650 MW

• Medium voltage network calculation • Medium voltage protection calculation, programming and testing

PP Ottensheim Verbund Austria / Hydro 9x25 MW

• Protection calculation, programming and testing machine 9

FHKW Spittelau Wien Energie Austria / 60 MW heat / 6 MW electr.

• Protection programming and testing

KW Simmering Wien Energie Austria / conversion of district cooling

• Protection programming and testing

div. Hydroelectric power plants Austria and internationally / up to 40 MW

• Basic engineering for medium and high voltage • Network calculation for medium and high voltage • Protection calculation for medium and high voltage

div. Wind and PV parks in Austria / up to 80 MW and transfer at 110/-30/-20 kV level

• Basic engineering medium voltage • Network calculation medium voltage • Protection calculation medium voltage

Mondi Frantschach Austria / total generator power 90 MW

• Basic engineering for the new construction of the medium-voltage main distribution board • Network calculation for medium voltage • Protection calculation for medium voltage

Hamburger Pitten Austria / total generator power 40 MW

• Basic engineering for the new construction of the medium-voltage main distribution board • Network calculation for medium voltage • Protection calculation for medium voltage

Cayirhan, Turkey, 2x160 MWel

• Lignite-fired power plant • EPC tender negotiations and project implementation • Project volume €500 million

Girne, North Cyprus, 2x60 MWel

• Oil-fired power plant • EPC project implementation • Project volume €200 million

Sicet, Italy, 20 MWel

• Biomass BFB plant • Project manager EPC

RHKW Linz, 66 MWth

• BFB incineration of waste and sludge

Planung, Fertigung & Auslieferung von Dampfkessel

Project delivery - Construction - Pressure testing in accordance with the Pressure Equipment Directive and AD2000 guidelines - Delivery

Construction of tanks – gas power plant

Conception – project management – ​​production – assembly – risk management

Fertigung & Auslieferung von Wärmetauscher und Reaktor

Coordination – project management – ​​production – pressure test – customs clearance

Modernisierung der Fernwärmesysteme in 3 Städten Serbiens

Kunde: Wärmeversorgungsunternehmen der Städte Mali Zvornik, Priboj und Novi Pazar in Serbien, Kreditanstalt für Wiederaufbau, Serbisches Ministerium für Bergbau und Energie Umrüstung der Fernwärmeerzeugung von fossilen Brennstoffen (Erdgas, Schweröl) auf Biomasse (Hackgut), Erneuerung der Fernwärmenetze und Installation von Wärmeübergabestationen. Projektleitung, FIDIC Engineer, Experte für Biomassekessel und Fernwärmenetze

Fernwärme der Stadt Lenart / Slowenien

Kunde: Eko Toplota Energetika d.o.o. Implementierung eines Fernwärmesystems mit Biomassekessel, Fernwärmenetz und Hausübergabestationen in der Stadt Lenart Projektleitung, Experte für Biomassekessel

Revision des Biomasse-Dampfkessels in Hartberg

Kunde: KELAG Wärme GmbH Austausch des kompletten Druckkörpers sowie des LUVOs eines biomassegefeuerten Sattdampfkessels mit einer Dampfleistung von 26 t/h. Projektleitung

11.02.2025

Strategic partnership between IKW and TBP Group

beide Unternehmen haben vereinbart ihre Ressourcen und ihr Know-how zu bündeln um ihren Kunden umfassende Gesamtlösungen mit einem breiten Spektrum an Fachbereichen zu bieten. Die IKW Industriekraftwerke E&C GmbH ist spezialisiert auf verfahrenstechnische Konzepte, Energieeffizienz und Gesamtplanung im Energieanlagenbau. Die TBP GROUP mit ihren Tochterunternehmen TBP Engineering GmbH, TBP UPCON GmbH und TBP Interprojekt Sp. z.o.o. Poland, sind erfahrene und kompetenter Partner für die Elektrotechnische Anlagenplanung in der Energieerzeugung und der Energieverteilung. Mit einem umfassenden Leistungsportfolio und tiefem Branchen-Know-how begleiten nun IKW und TBP ihre Kunden von der ersten Planungsidee bis zur erfolgreichen Inbetriebnahme des Investitionsprojekts. Dabei setzen die Partner-Unternehmen auf modernste Planungswerkzeuge, hochqualifizierte Mitarbeiter und eine enge Zusammenarbeit mit dem Auftraggeber, um maßgeschneiderte Lösungen zu entwickeln.

Read More
15.05.2024

How to achieve the green transformation

Two out of five companies do not have an action plan to achieve climate neutrality by 2040 and are not planning one either. Gunther Reimoser from EY Austria and Christian Plas from EY denkstatt report on why this is a cause for concern and what opportunities sustainability brings to companies.

Read More
23.02.2023

Financing tool for investments in renewables (c Industriemagazin)

There is now a new financing option for companies with an export share of over 20 percent who are investing in switching from fossil fuels to renewable energies (RE) at their Austrian location. Exportinvest Green Energy was introduced by the Federal Ministry of Finance (BMF) and the Austrian Control Bank (OeKB). The liability framework is up to three billion euros, in individual cases up to 300 million euros.

Read More
05.11.2022

Norske Skog residue power plant

Residue power plant is opened by the Minister for the Environment: The use of this boiler reduces the consumption of natural gas by up to 75 percent. The plant uses regional alternative fuels and regional residues and converts them into electrical and thermal energy. This in turn reduces the company's dependence on Russian gas and also reduces the overall CO2 effort. We would be happy to help you to implement an analogue system for your company!

Read More
03.11.2022

Transformation of the economy - funding program for industry:

Transformation of the economy - funding program for industry: Applicants are invited to submit projects to reduce greenhouse gas emissions from processes. In the second call for proposals (probably Q1 2023), energy efficiency projects, renewable energy and low-GHG production processes will be funded. We will be happy to help you find your energy efficiency projects, realize potential and gain funding!

Read More

IKW Industriekraftwerke E&C GmbH
Invalidenstrasse 1/12
1030 Vienna
Austria
office@industriekraftwerke.at
www.industriekraftwerke.at