Construction of a mono sewage sludge incineration plant for 30,000 tons per year of municipal sewage sludge
Exclusive acceptance of external sludge.
Our scope of services as owner's engineer includes:
Sewage sludge capacity: 30,000 t/a (approx. 25% TS)
disc dryer
Fluidized bed furnace (incl. hot desulfurization) with downstream
switched thermal oil boiler
Dry flue gas cleaning (quench, fabric filter)
Fuel heat output 2.2 MW net heat generation