Energy efficiency, measures for waste heat utilization

  • Utilization of low-temperature waste heat from exhaust air hoods of paper machines and conversion into steam for the plant network
  • Utilization of low-temperature waste heat from cooling circuits and conversion into steam for the mill network
  • Recovery of cellulose from reject waste
  • Realization of a “water-free power plant” for places without infrastructure and countries with water scarcity

General planning in energy production

  • With concept engineering with economic feasibility studies
  • Approval planning and basic engineering
  • Tenders, support during the purchasing process
  • Project management until the plant is handed over

EPC-M, support in implementation

  • We act as general planners
  • Prepare the invitations to tender, by lot or according to focal points
  • Support the purchasing process
  • Act as owner's engineers during implementation and take care of deadlines, quality, finances and interfaces
  • Carry out production control Create and monitor the assembly and commissioning of the entire system

Project engineers and consultants in numerous topics of energy, energy efficiency and energy generation

  • Fuels and alternative fuels such as RDF and sludge, biomass, new fuels such as liquid biogenic fuels, or ethanol and methanol
  • Boiler plants, steam turbines, gas turbines, gas engines
  • Power to heat
  • Waste to energy
  • Energy storage in large-scale battery systems, steam storage or large-scale district heating storage systems
  • Operational management
  • CE marking, plant safety, risk assessment
  • District heat extraction, innovative heat pump solutions, steam heat pumps
  • Participation in the balancing energy market
  • Special topics such as hydrogen, CO2 certificates, electricity exchange, carbon capture, control and balancing energy, financing of complete plants, contracting
  • CHP plants in general and combined heat and power plants with/without district heating extraction with maximum electrical efficiency (>60%)
  • Profitability analysis incl. CAPEX and OPEX estimation
  • Production monitoring, installation monitoring, commissioning monitoring